GroundTech completed the Taber Irrigation District lateral 7 pipeline in late 2021.
This project included the install of:
-750m Of 24″ pipe installed in extremely wet soil conditions
-36″ 160m long auger bore Under 3 sets of railway tracks
-Drop structure and multiple tie ins to existing pipelines
-Surface restoration work